IIASA’s main involvement is in WP’s 1, 2 and 5. IIASA a) contribute to the inventory and conceptualisation of the Tools4CAP framework (WP1), b) evaluate the applicability and adjustment needs of the GLOBIOM model for the assessment of CAP Strategic Plans (WP2) and c) together with CzechGlobe, develop a case study using the GLOBIOM model for the design of the future Czech Strategic Plan (WP5).